Layout Update for August 2019
Work resumes on the Owensville Terminal Railroad after sitting idle for over a year.
The backdrop panels for the ends of the layout have been installed. Priming the backdrop starts with the first coat of primer. I'm using a flat white interior wall paint.
The sky color was applied with a foam brush. The first coat was streaky and looked horrible. I ditched the foam brush and painted a second coat with a soft bristle brush. It looks much better, but the sky is now a solid color without any variation. I will change the flat look by painting atmospheric effects and clouds.
The end panel on the right will one day have a photo of a railroad crossing applied to it. I'm still searching for an image online that will fit the bill. I still need to finish running bus wires to the right side of the layout. Feeder wires need to be soldered to the rails, then dropped down underneath the layout. I will be able to start with painting the track, scenery, and ballasting the track after installing the feeder wires.
Until next time,
Tom